Sign In | Join Free | My burrillandco.com
Home > Soil Testing Drilling Rig >

High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter

    Buy cheap High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter from wholesalers
     
    Buy cheap High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter from wholesalers
    • Buy cheap High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter from wholesalers
    • Buy cheap High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter from wholesalers

    High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter

    Ask Lasest Price
    Brand Name : JINZHOU SHITAN
    Model Number : GK 200
    Certification : ISO9001
    Price : Negotiation
    Payment Terms : T/T, Western Union
    Supply Ability : 5000 sets per year
    Delivery Time : 3-5 days
    • Product Details
    • Company Profile

    High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter

    High Speed Core Engineering 300 mm Hole Diameter Soil Testing Drilling Rig


    GK-200 Soil Testing Drilling Rig


    Gk-200 drilling machine is hydraulic feeding with the characteristics of large power, large lifting force (2T) and high transmission torque.


    GK-200 Soil Testing Drilling Rig Tech Data:


    Drilling Rig
    Drilling diameter(mm)75,91,110,130,150,300
    Drilling depth (m)200,150,100,70,50,30
    Drill pipe diameter (mm)42,50
    Drilling angle(°)90~75
    Equipment size(L * B * H)1730 * 860 * 1360 (mm)
    Rig weight (except engine)700
    Mobile device
    Moving length350mm
    Leave distance300mm
    Gyrator
    Spindle speed (four gear) (r/min)115,230,505,1010
    Spindle travel(mm)450
    Spindle no-load lifting maximum moving speed(m/s)0.05
    Spindle no load drop maximum movement speed(m/s)0.067
    Spindle maximum feed pressure(KN)15
    Spindle maximum lifting force(KN)25
    Spindle maximum output torque(KN• m)1.5
    Winch assembly
    Winch maximum lifting force (single rope)20
    Reel speed (r/min)20,39,85,170
    Reel circumferential speed(m/s)0.172,0.345,0.738,1.476
    Reel diameter(mm)140
    Wire rope diameter(mm)9.3
    Wire rope density (m)40
    Brake diameter(mm)278
    Brake band width (mm)50
    Oil pump
    Oil pump typeYBC -20/125
    Nominal pressure (Mpa)12.5
    Rated flow(ml/r)20
    Rated speed(r/min)800-2500
    Diesel engine or motor
    Diesel engine1115
    Rated power (KW)16.2
    Rated speed (r/min)2200
    Rated pressure(Mpa)12.5
    Motor typeY160M - 4
    Rated power (KW)11
    Rated speed (r/min)1460


    GK-200 Soil Testing Drilling Rig Features:

    1.hydraulic cylinder, high efficiency ·wheeled walking mechanism, very convenient for transport and adjusting the drilling rig level. 2.·pressure gauge display the condition of the bottom of the drill hole. ·the drilling rig is equipped with a ball card holding mechanism instead of chuck, and it can be operated without stopping the rod.

    GK-200 Soil Testing Drilling Rig Application:


    1. With hydraulic automatic feeding device, elevated drilling efficiency.

    2. The holding mechanism with upper spherical jaws is used as substitute for chuck. The rod can be replaced without shutdown.

    3. Centralized handles, easy operation, safe and reliable.

    4. The pump and diesel engine are installed on common base frame in order to have a compact structure and occupy small field area. lightweight, high detachability, easy transportation and suitable for the operations in plains or mountain areas.


    Oil filter element:


    1. Unscrew and discard the oil filter.

    2. Clean the filter shell by self suction and dredge the front and rear differential pressure through holes.

    3. Check whether the differential pressure transmitter is normal.

    4. Fill the new filter element with oil and apply a layer of oil on the sealing ring of the filter element.

    5. When installing the filter element, screw it until it contacts the sealing gasket, and then manually tighten it by 1 / 3 turn.

    6. After startup, check whether there is leakage.

    Note: the filter element can be replaced only after the screw machine is stopped and the pressure is released. Be careful of hot oil to prevent scalding.



    High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole DiameterHigh Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole DiameterHigh Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter


    Quality High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Jinzhou City Shitan Machinery Equipment CO. LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)