Sign In | Join Free | My burrillandco.com
Home > Water Well Drilling Rig Machine >

St 180 Water Well Drilling Machine Rubber Crawler Mounted Large

    Buy cheap St 180 Water Well Drilling Machine Rubber Crawler Mounted Large from wholesalers
     
    Buy cheap St 180 Water Well Drilling Machine Rubber Crawler Mounted Large from wholesalers
    • Buy cheap St 180 Water Well Drilling Machine Rubber Crawler Mounted Large from wholesalers
    • Buy cheap St 180 Water Well Drilling Machine Rubber Crawler Mounted Large from wholesalers

    St 180 Water Well Drilling Machine Rubber Crawler Mounted Large

    Ask Lasest Price
    Brand Name : ShiTan
    Model Number : ST 180
    Certification : ISO9001
    Price : Negotiation
    Payment Terms : T/T, Western Union
    Supply Ability : 2000 sets per year
    Delivery Time : Within 7-12 days
    • Product Details
    • Company Profile

    St 180 Water Well Drilling Machine Rubber Crawler Mounted Large

    ST 180 Rubber Crawler Mounted Large Water Well Drilling Rig Machine


    ST 180 Water Well Drilling Rig Machine Product Description


    It is suitable for industrial and civil drilling and geothermal drilling. It has the advantages of large drilling diameter, deep drilling, fast footage, flexible movement and high efficiency.

    ST 180 Water Well Drilling Rig Technical Data

    ST 180 Water Well Drilling Machine Details
    ST 180 Drilling depth180m
    ST 180 Drill rod caliber42mm
    Hole diameter75mm
    Drilling angle90°-75°
    Dimensions2120*875*1480mm
    Weight(without power unit)750kg
    Swivel head
    Spindle speed71,182,310,790r/min
    Spindle stroke450mm
    Upward displacement speed of idling vertical spindle0.05m/s
    Downward displacement speed of idling vertical spindle0.067m/s
    Spindle pull-down max.15KN
    Spindle lifting capacity max.25KN
    Spindle max.torque1.5KN.m
    Brake diameter278mm
    Brake belt width50mm
    Hoist
    Max. lifting capacity20KN
    Hoisting drum revolution20,39,85,170r/min
    Drum diameter140mm
    Wire rope diameter9.3mm
    Wire rope capability40m
    Oil pump
    ModelYBC-20/125
    Rated presure12.5Mpa
    displacement20ml/r
    rated speed800-2500r/min
    Water pump
    Displacement max.95(77)L/min
    Working pressure max.1.2Mpa
    Rated pressure0.7Mpa
    Liner diameter80mm
    Piston stroke100mm
    Power(diesel engine or motor)
    Rated power16.2KW
    Rated speed2200r/min
    Electric motorY160M-4
    Rated power11Kw
    Rated speed1460r/min

    ST 180 Water Well Drilling Rig Advantages

    The machine can be used in various strata, such as water well engineering, geothermal well, anchor pile hole, etc., and can use pipe following drilling tools. It has the advantages of hydraulic control of the whole machine, automatic loading and unloading of drill pipes, crawler chassis, high-power diesel engine, four corner hydraulic balance, stronger terrain applicability and so on

    ST 180 Portable Water Well Drilling Rig Attentions

    1. Safety inspection shall be carried out when loading and unloading the drilling rig. All parts of the drilling rig shall be complete, and the cable shall be free of electric leakage, drill pipe, drilling tool and other five damage phenomena;
    2. The loading of drilling rig shall be firm, and the turning or ramp shall be slow and fixed with steel wire fixing points;
    3. When entering the construction site, the rig tower shall be fixed, the area of the drilling site shall be larger than the rig base, and there shall be enough safety space around;
    4. The drilling shall be carried out in strict accordance with the hole position, orientation, angle and depth, and the driller shall not change it without authorization;
    5. When installing the drill pipe, check the drilling rig to ensure that the drill pipe is not blocked, bent and the screw mouth is not worn. Unqualified drill pipes are strictly prohibited;
    6. When loading and unloading the drill bit, strictly prevent the pipe tongs from clamping the cemented carbide sheet, flattening the drill bit and core pipe;
    7. When installing the drill pipe, the second drill pipe must be installed after the first one is installed;
    8. When drilling with clean water, water supply is not allowed before drilling, and pressure drilling can be carried out only after the water returns, and sufficient flow shall be ensured. It is not allowed to dry the hole. When there is a lot of rock powder in the hole, the water volume shall be increased, the pump on time shall be extended, and the drilling can be stopped only after the hole is flushed;

    St 180 Water Well Drilling Machine Rubber Crawler Mounted Large


    St 180 Water Well Drilling Machine Rubber Crawler Mounted Large

    Quality St 180 Water Well Drilling Machine Rubber Crawler Mounted Large for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Jinzhou City Shitan Machinery Equipment CO. LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)