Sign In | Join Free | My burrillandco.com
Home > Soil Testing Drilling Rig >

Gold Mining Xy-1a Exploration Drilling Rig For 150 Meters Deep

    Buy cheap Gold Mining Xy-1a Exploration Drilling Rig For 150 Meters Deep from wholesalers
     
    Buy cheap Gold Mining Xy-1a Exploration Drilling Rig For 150 Meters Deep from wholesalers
    • Buy cheap Gold Mining Xy-1a Exploration Drilling Rig For 150 Meters Deep from wholesalers
    • Buy cheap Gold Mining Xy-1a Exploration Drilling Rig For 150 Meters Deep from wholesalers

    Gold Mining Xy-1a Exploration Drilling Rig For 150 Meters Deep

    Ask Lasest Price
    Brand Name : JINZHOUSHITAN
    Model Number : XY-1A
    Certification : ISO
    Price : USD4200-4800/SET
    Payment Terms : T/T, Western Union
    Supply Ability : 2000 sets per year
    Delivery Time : 7-10 days
    • Product Details
    • Company Profile

    Gold Mining Xy-1a Exploration Drilling Rig For 150 Meters Deep

    Shitan Machinery Gold Mining Exploration Xy-1 A 150 Meters Soil Testing Drilling Rig


    Gold Mining Exploration Xy-1 A 150 Meters Soil Testing Drilling Rig Description


    XY-1A Hydraulic Drilling Rig Machine is a applicable for high-way and building construction foundation drilling ,general survey, geophysical exploration and blast hole drilling etc. XY-1A Drilling Rig Machine was based on XY-1 100m Depth Hydraulic Drilling Rig Machine adding three drilling rig components parts of hydraulic swivel head, mobile oil cylinder and trailer underframe


    Xy-1 A 150 Meters Soil Testing Drilling Rig Parameter


    Drill rig technical informationSwivel Head

    Drilling depth


    Max.150m

    Spindle speed


    1010,790,470,295,140(r/min)

    Hole diameter


    Max.150mSpindle stroke450kmm
    Drill rod diameter42mmSpindle pull-downMax.15KN
    Angle range90-75Spindle lifting capacityMax. 25KN
    Oil pumpWater pump
    ModelYBC-12/125ModelHorizontal reciprocating single-acting piston pump
    Rated pressure12.5MpaWorking pressureMax. 1.25Mpa
    Flow speed8ml/r
    Rated speed1500r/min
    HoistPower(diesel)
    Max. lifting capacity15KNModel(diesel engineZS1105
    Hoisting drum revolution

    121,76,36(r/min)


    Rated power12.1KW
    Drum diameter140mmRated speed2200r/m
    WEIGHTAROUND 600KG
    SIZE1620*970*1560mm


    Gold Mining Exploration Xy-1 A 150 Meters Soil Testing Drilling Rig Main Attentions


    1.keeping bracket is installed on the hoist to form a double wheel support structure, can withstand strong blow.

    2.Vertical box four couple of bearings positioned to ensure the rotary machine has a sufficient rigid response to gravel layer ,the complex geological conditions.

    3.This machine adopts national patent technology taper clutch and is with charactristics of strong transmission torque,easy operation,free maintenance.

    4.Using 46x51 active drill rods which is with high rigitidy, strong delivery torque.


    Operation Attentions of The Drilling Rigs


    1.The drill shall be placed stably and firmly, and the tappet shall be adjusted by automatic fine adjustment or plumb hammer to keep it vertical.
    2.Before startup, check and confirm that all parts of the drilling rig are firmly connected, the tightness of the transmission belt is appropriate, the oil level in the reduction box meets the regulations, and the drilling depth limit alarm device is effective.
    3.Before starting, the control lever shall be placed in the neutral position. After starting, the idle operation test shall be carried out to check that the instruments, temperature, sound, braking and other works normally before operation
    4.During operation, when the rotation direction of the drilling rig needs to be changed, it shall be carried out after the drilling rig stops completely.
    5.When drilling, when the frame shakes, moves, deviates or there is a rhythmic sound in the drill bit, the drilling shall be stopped immediately. After treatment, the drilling can be continued.
    6.In case of power failure, put all controllers at zero position, cut off the power supply, and pull out all drill pipes in time to make the drill bit contact the ground.
    7.During the operation of the drilling rig, the cable shall be prevented from being entangled in the drill pipe and must be watched by a specially assigned person.

    Gold Mining Xy-1a Exploration Drilling Rig For 150 Meters Deep

    Gold Mining Xy-1a Exploration Drilling Rig For 150 Meters Deep

    Quality Gold Mining Xy-1a Exploration Drilling Rig For 150 Meters Deep for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Jinzhou City Shitan Machinery Equipment CO. LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)