Sign In | Join Free | My burrillandco.com
Home > Pneumatic Borewell Machine >

Continuous Operation Tracked Drilling Rig With High Stability

    Buy cheap Continuous Operation Tracked Drilling Rig With High Stability from wholesalers
     
    Buy cheap Continuous Operation Tracked Drilling Rig With High Stability from wholesalers
    • Buy cheap Continuous Operation Tracked Drilling Rig With High Stability from wholesalers
    • Buy cheap Continuous Operation Tracked Drilling Rig With High Stability from wholesalers
    • Product Details
    • Company Profile

    Continuous Operation Tracked Drilling Rig With High Stability

    Pneumatic Water Well Drilling Rig With Strong Drilling Ability And Flexible Steering

    The core working principle of pneumatic drilling rig is to convert the pressure energy of compressed air into mechanical energy. Through the two core components of pneumatic motor and impactor, the rotation and impact actions of the drilling tool are respectively achieved, and finally rock breaking drilling is completed. The specific process can be divided into three key links: power transmission, action execution, and drilling operation

    Technical Specifications
    ParameterValue
    Product TypeCrawler Mounted Drilling Rig
    Drilling Hole Diameter105-300 mm
    Drilling Rod Length3 m
    Weight5.5 MT
    Rotary Torque5900
    MaterialRubber Track
    Walking speed2.5km/h
    Lifting Force18T
    Maximum Rotational Speed30/120r/min
    Climbing degree30
    High leg travel1.35m
    Overall Dimensions3.8m*1.8m*2.3m
    EngineXidong:65KW
    Power on safety control

    Slowly open the air compressor air duct valve, using the "small opening → gradually increasing" method to allow high-pressure gas to slowly enter the drilling rig, exhaust residual air in the air duct, and avoid instantaneous impact of airflow damaging the pneumatic motor or impactor;

    After starting the drill switch, idle for 1-2 minutes to observe whether the pneumatic motor runs smoothly and whether there is any abnormal noise from the impactor. At the same time, test whether the emergency stop button is sensitive. After confirming that there are no problems, lower the drilling tool.

    Safety regulations for drilling process

    Drilling stage: "Low speed, light pressure" drilling is adopted (drilling pressure ≤ 1/3 of the rated value), and after the drilling depth reaches 10-20cm (forming a stable guide hole), the speed and drilling pressure are gradually increased to prevent the drill rod from deviating and causing the drilling rig to tilt;

    Real time monitoring parameters: closely observe the pressure gauge and the vibration of the drilling rig during drilling. If there is a sudden drop in pressure, severe shaking of the drill pipe, or abnormal noise from the impactor, immediately press the emergency stop button, close the air duct valve, and troubleshoot (such as stuck drill or worn drill bit). It is forbidden to operate with faults;

    Prohibited dangerous operations: It is strictly prohibited to touch rotating drill rods or bits with hands during drilling, to stand directly below the drilling rig (to prevent drilling tools from falling), and to dismantle air ducts or drill rods while the drilling rig is in operation; Before adding drill rods, the machine must be stopped, the gas must be cut off, and the drill rod threads must be cleaned before connecting.

    Product Images
    Front view of ST-200 drilling rig
    Continuous Operation Tracked Drilling Rig With High Stability Continuous Operation Tracked Drilling Rig With High Stability
    Side view of ST-200 drilling rig
    Operational view of drilling rig
    Continuous Operation Tracked Drilling Rig With High Stability Continuous Operation Tracked Drilling Rig With High Stability
    Track detail of drilling rig
    Drilling mechanism close-up
    Quality Continuous Operation Tracked Drilling Rig With High Stability for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Jinzhou City Shitan Machinery Equipment CO. LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)